An Integrated Production-Supply System with Uncertain Demand, Nonlinear Lead Time and Allowable Shortages

An Integrated Production-Supply System with Uncertain Demand, Nonlinear Lead Time and Allowable Shortages

Hengameh Tahmasebi, Junfang Yu, Bhaba R. Sarker
DOI: 10.4018/joris.2012100101
OnDemand:
(Individual Articles)
Available
$37.50
No Current Special Offers
TOTAL SAVINGS: $37.50

Abstract

A supply chain consisting of a single-supplier and a single-buyer is modeled and compared in two different modes: non-coordinated and coordinated. The model is established based on the fact that the demand is uncertain and shortages are considered as lost sales. The buyer’s order lead time is a nonlinear function of the buyer’s order size and the number of shipments from the supplier. Quantity discount offers are used as a tool to achieve the coordination between both parties. In non-coordinated mode the total annual profits of both parties are maximized using partial derivative and a lower and an upper bound are obtained for the supplier’s wholesale price. For the coordinated mode total annual profit of the whole supply chain system is maximized using partial derivatives and coordination may increase the total annual profit of the whole system is mathematically proved. In order to encourage the both parties to coordinate, a fair profit-sharing method is proposed based on the total costs that each party incurs. The supplier’s wholesale price is evaluated such that coordination seems appealing and profitable for both parties.
Article Preview
Top

Introduction

In today’s competitive market, companies are realizing that efficient inventory management across the entire supply chain can be achieved through high coordination and cooperation among the parties of a supply chain. Recent advances in information technology allow all the parties to communicate much faster and cheaper than before. This facilitates the coordination efficiently and effectively. It is only through high coordination that the parties of a supply chain can make joint decisions to increase their profits.

When the Japanese first introduced the Just-in-Time (JIT) production system, researchers got interested in the idea of coordination. If the supplier and the buyer mutually cooperate, they can develop long-term relationships, solve problems together, make joint decisions, and find a way to share the savings. The advantages of the coordinated inventory models include lead time reduction, technology sharing, lower costs, lower inventory levels and improved quality and customer service. Banerjee (1986) proposes a single-vendor single-buyer deterministic inventory model where he assumes a lot-for-lot policy. Goyal (1988) develops a model in which Banerjee’s lot-for-lot assumption is relaxed. Since then lots of papers have been written in this area all showing that the integration of the parties results in lower costs and higher overall profits.

Finding a proper mechanism to coordinate is one of the main hassles of a supply chain manager. Quantity discount offers can be mentioned as one way to do so. The supplier can offer discounts to the buyer in either all-unit or incremental form. Weng (1995a) shows that if the supplier has complete knowledge of the buyer’s information, the optimal policy in benefiting both the supplier and buyer is independent from the type of quantity discounts. Therefore, the supplier should be more concerned with finding an optimal discount-price rather than selecting the type of quantity discount. Monahan (1986) studies a deterministic non-coordinated single-supplier model with infinite production rate and lot-for-lot assumption. He shows that the supplier can increase his profit by offering an all-unit discount to a buyer. As the managers got acquainted with the idea of coordination in 1990s, they were more eager to utilize quantity discounts as a tool to achieve coordination. Weng (1995b) develops a single-supplier single-buyer supply chain where demand is a deterministic function of the selling price. The main focus of his paper is to find a method to divide the increased profit resulted from coordination between both parties.

Mishra (2004) uses a selective discount for supplier-buyer coordination using common replenishment epochs and Sucky (2004) develops a coordinated order and production policies in supply chains. Shin and Benton (2007) propose a quantity discount approach to supply chain coordination while Lau et al. (2007) explains the pricing and volume discounting for a dominant retailer with uncertain manufacturing cost information. Altintas et al. (2008) study quantity discounts under demand uncertainty. Coordinated approaches in supply chains are modeled and investigated by many authors such as Cachon and Kok (2010), Darwish and Odah (2010), Khouja et al. (2010), Lee and Rhee (2010), Li et al. (2010), and Xiao et al. (2010).

Whenever demand is probabilistic, the role of lead times becomes even more critical (Yang & Pan, 2004). When the lead time is shorter the buyer’s safety stock level in inventory is lower which in turn results in lower inventory levels, less spoilage of the perishable product, and less storage space, but more susceptible to shortage. In most of the previous studies the lead time is assumed to be constant for the sake of simplification.

Complete Article List

Search this Journal:
Reset
Volume 15: 1 Issue (2024)
Volume 14: 1 Issue (2023)
Volume 13: 2 Issues (2022)
Volume 12: 4 Issues (2021)
Volume 11: 4 Issues (2020)
Volume 10: 4 Issues (2019)
Volume 9: 4 Issues (2018)
Volume 8: 4 Issues (2017)
Volume 7: 4 Issues (2016)
Volume 6: 4 Issues (2015)
Volume 5: 4 Issues (2014)
Volume 4: 4 Issues (2013)
Volume 3: 4 Issues (2012)
Volume 2: 4 Issues (2011)
Volume 1: 4 Issues (2010)
View Complete Journal Contents Listing